OVERVIEW
Restoration Systems was contracted in Summer of 2019 to perform exterior masonry and stone rehabilitation at the 425 Washington Avenue Building in Minneapolis, Minnesota. Restoration Systems Inc. worked intimately with the City of Minneapolis and its Heritage Preservation Commission to ensure the project met and followed the Minneapolis Warehouse Historic Design Guidelines and the rehabilitation guidelines of The Secretary of the Interior’s Standards for the Treatment of Historic Properties. The extent of the repairs consisted of removing and tucking back exterior mortar, brick replacement on the building’s exterior, and exterior stone patching.
SCOPE OF WORK
>> Exterior Facade Tuckpointing
>> Exterior Brick Replacement
>> Exterior Stone Patching
SNAPSHOT
>> Start Date: September 2019
>> Duration: 2 Months
CASE STUDIES
FEATURED PROJECTS
15 BUILDING
Exterior work including facade tuckpointing, brick replacement, and stone patching.
MERCY HEART HOSPITAL
Exterior work, roof repairs, thru-wall flashing, and sealant replacement.
MSP INTERNATIONAL AIRPORT
Repairs to concrete, sealant, and electrical and mechanical systems.
WELLS FARGO
CENTER
Multi-year phased project to install sealant and custom window gaskets.