W HOTEL AT THE FOSHAY TOWER
MINNEAPOLIS, MINNESOTA
OVERVIEW
Restoration Systems was contracted to perform concrete, drainage, and waterproofing repairs at the W Hotel Foshay Tower Minneapolis, Minnesota. Restoration Systems, Inc. worked closely with hotel and restaurant management to ensure the project needs met with limited interruption to the operations of the restaurant storage and hotel parking. The extent of the repairs consisted of removal of the existing waterproofing system to identify concrete distress locations. After the concrete repairs were complete, the plumbing and sprinkler systems were repaired along with a new waterproof traffic coating application.
SCOPE OF WORK
>> Concrete Repairs
>> Traffic Coating
>> Mechanical Improvements
SNAPSHOT
>> Start Date: January 2024
>> Duration: 2 Months
CASE STUDIES
FEATURED PROJECTS
15 BUILDING
Exterior work including facade tuckpointing, brick replacement, and stone patching.
MERCY HEART HOSPITAL
Exterior work, roof repairs, thru-wall flashing, and sealant replacement.
MSP INTERNATIONAL AIRPORT
Repairs to concrete, sealant, and electrical and mechanical systems.
WELLS FARGO
CENTER
Multi-year phased project to install sealant and custom window gaskets.