Restoration Systems was contracted in the Spring of 2024 to perform exterior envelope repairs at the Wisconsin Tower Condominums. This art deco inspired building, constructed in the 1930s, is Milwaukee’s second tallest stone-faced building. Restoration Systems Inc. worked with the Owner and City of Milwaukee to utilize a specialty 250 foot aerial platform with 128 foot outreach to cover repairs across 35,000 square feet of area in 20 days. Repairs included stone patching, stone anchoring, tuckpointing, and sealant replacement.
SCOPE OF WORK
>> Stone Patching
>> Stone Anchoring
>> Tuckpointing
>> Sealant Replacement
SNAPSHOT
>> Start Date: September 2024
>> Duration: 1 Month
CASE STUDIES
FEATURED PROJECTS
15 BUILDING
Exterior work including facade tuckpointing, brick replacement, and stone patching.
MERCY HEART HOSPITAL
Exterior work, roof repairs, thru-wall flashing, and sealant replacement.
MSP INTERNATIONAL AIRPORT
Repairs to concrete, sealant, and electrical and mechanical systems.
WELLS FARGO
CENTER
Multi-year phased project to install sealant and custom window gaskets.