HUMAN SERVICES BUILDING

ALBERT LEA, MINNESOTA

OVERVIEW

Restoration Systems was contracted in Summer of 2024 to perform exterior restoration at the Human Services Building in Albert Lea, Minnesota. Restoration Systems, Inc. worked closely with the engineering team and building ownership to ensure the project met the project schedule and limited interruption of the building operations. To limit interruption, RSI utilized an aerial drop map to notify tenants each day of where the location of work was to take place. The extent of the repairs consisted of removing and tucking back exterior mortar, brick replacement on the building’s exterior, control joint sealant replacement, exterior façade cleaning, and exterior waterproof coating.

SCOPE OF WORK

>> Exterior Facade Tuckpointing

>> Exterior Brick Replacement

>> Exterior Control Joint Sealant Replacement 

>> Exterior Waterproof Coating

 

SNAPSHOT

>> Start Date: August 2024

>> Duration: 2 Months

CASE STUDIES

FEATURED PROJECTS

15 BUILDING

Exterior work including facade tuckpointing, brick replacement, and stone patching.

READ MORE

MERCY HEART HOSPITAL

Exterior work, roof repairs, thru-wall flashing, and sealant replacement.

READ MORE

MSP INTERNATIONAL AIRPORT

Repairs to concrete, sealant, and electrical and mechanical systems.

READ MORE

WELLS FARGO
CENTER

Multi-year phased project to install sealant and custom window gaskets.

READ MORE