PARKING RAMP REPAIRS
GREEN BAY, WISCONSIN
OVERVIEW
In 2023, Restoration Systems Inc. was contracted to complete repairs at the Pine Street Ramps 1-23 for the City of Green Bay, WI. In general, repair work included concrete repairs, expansion joint replacement, joint and crack repairs, and installation of a traffic bearing membrane. Additional repairs, including tendon, end anchorage, splice coupling, and embedded tendon repairs, were completed on the post-tension system with minimal change to the schedule and project phasing.
SCOPE OF WORK
>> Full and Partial Depth Concrete Repairs
>> Vertical and Overhead Concrete Repairs
>> Post-Tension Cable Repairs
>> Expansion Joint Replacement
>> Caulking Replacement
>> Curb Repair
>> Polymer Concrete Overlay Repairs
>> Traffic Bearing Membrane Installation
SNAPSHOT
>> Start Date: July 2023
>> Duration: 4 Months



CASE STUDIES



